Fuel Train

Natcom® Engineered Solutions
CB-8494D

  • Natural gas, refinery gas, hydrogen, landfill, digester gas, tail gas, or other alternative gaseous or liquid fuels
  • Carbon steel or Stainless steel piping
  • Windbox- or rack-mounted
  • Main and zone trains for multiple burner applications

 

Cleaver-Brooks offers pre-assembled piping systems for a wide range of gaseous and liquid fuel applications.

  • Product Overview
  • Related Resources
  • Applications
  • NFPA 85, FM, CSA B149.3, ASME B31.1 or B31.3
  • Safety Integrity Level (SIL) and hazardous locations designs
  • Accommodation for addition of steam superheater.
  • Moisture removal management
  • Pressure-reducing stations
  • Gaseous fuel mixing station

 

Cleaver-Brooks provides fuel trains that precisely and repeatedly meter the fuel flow to your specific burner application. Our design team has in-depth experience with diverse fuel compositions, fuel supply conditions, and burner arrangements.

WEBINARS

Improve Boiler Performance by Replacing the Burner →

In this webinar, attendees will learn the benefits of upgrading their boiler with a new state-of-the-art burner to improve boiler efficiency and better match facility needs.

Parallel Positioning and O2 Trim →

Parallel positioning controls help a burner to optimize its fuel-to-air ratio by using dedicated motorized actuators for the fuel and air valves.

CASE STUDY

Boiler Retrofit the Right Solution at Mount Royal University →

Reduce carbon footprint and bring boilers into compliance with local gas code

  • Process Steam
  • Industrial Process
  • Waste Heat Recovery
  • Hospital and Healthcare
  • Power and Utilities
  • Refineries and Petrochemical