CBEX Firetube Boiler
- Steam up to 300 psig
- Hot water up to 125 psig
- 100 to 2,500 HP
- 2 Pass and 3 Pass
- Natural gas/propane, #2 light oil, combination
- Waterback or Dryback design
- Offers 30 ppm NOx with 3% O2 across the 10:1 turndown range
- Sub 5 ppm NOx without SCR available on most models
- Meets 10 ppm CO requirement
- 3 pass model includes an option for an integral pre-piped feedwater economizer
The Cleaver-Brooks CBEX firetube boiler featuring EX technology is a completely integrated boiler, burner, and controls system. Every core component has been designed and built by Cleaver-Brooks to work together, resulting in the most efficient and lowest-emissions firetube system ever built.
The CBEX achieves higher operating efficiency than competitors' boilers, leading to lower fuel consumption over the life of the boiler. It can also burn renewable fuels and meets the lowest possible emissions of <5 ppm NOx, <10 ppm CO without SCR, helping achieve both emissions reduction and decarbonization goals.
- Advanced Tube Design(Literature)
- Boiler Efficiency and Firing Rate(Literature)
- Boiler Efficiency Guide(Technical Data)
- CBEX 2D 250-800 Boiler Book(Technical Data)
- CBEX 2W 100-800 Boiler Book(Technical Data)
- CBEX 2W 1300-2200 Boiler Book(Technical Data)
- CBEX 2W 900-1200 Boiler Book(Technical Data)
- CBEX Brochure(Literature)
- CBEX Hot Water Specifications(Technical Data)
- CBEX Steam Specifications(Technical Data)
- CBEX-2D 250-800 Dimensions and Ratings(Technical Data)
- CBEX-2D Hot Water ADSK Files(Drawings)
- CBEX-2D Hot Water DWG Files(Drawings)
- CBEX-2D Hot Water STP Files(Drawings)
- CBEX-2D Steam ADSK Files(Drawings)
- CBEX-2D Steam DWG Files(Drawings)
- CBEX-2D Steam STP Files(Drawings)
- CBEX-2D Warranty(Technical Data)
- CBEX-2W 100-800 Dimensions and Ratings(Technical Data)
- CBEX-2W 1300-2200 Dimensions and Ratings(Technical Data)
- CBEX-2W 900-1200 Dimensions and Ratings(Technical Data)
- CBEX-2W Hot Water ADSK Files(Drawings)
- CBEX-2W Hot Water DWG Files(Drawings)
- CBEX-2W Hot Water STP Files(Drawings)
- CBEX-2W Steam ADSK Files(Drawings)
- CBEX-2W Steam DWG Files(Drawings)
- CBEX-2W Steam STP Files(Drawings)
- CBEX-2W Warranty(Technical Data)
- CBEX-3W 250-800 Boiler Book(Technical Data)
- CBEX-3W 250-800 Dimensions and Ratings(Technical Data)
- CBEX-3W Brochure(Literature)
- CBEX-3W Warranty(Technical Data)
- Excess Air and Boiler Efficiency(Literature)
- Firetube Hot Water Installation Manual(Technical Data)
- Firetube Operation and Maintenance Manual(Technical Data)
- Firetube Startup Manual(Technical Data)
- Firetube Steam Installation Manual(Technical Data)
- Packaged Steam Solutions Brochure(Literature)
- Spanish - Boiler Efficiency Guide(Technical Data)
- Spanish - Firetube Hot Water Installation Manual(Technical Data)
- Spanish - Firetube Operation and Maintenance Manual(Technical Data)
- Spanish - Firetube Steam Installation Manual(Technical Data)
- Steam Reference Guide(Literature)
- Understanding Terminology White Paper(Literature)
- Product Overview
- Related Resources
- Applications
- Highest operating efficiency of any scotch marine firetube boiler
- Exclusive Cleaver-Brooks integral head burner with air-cooled front head
- Hawk controls for maximum efficiency
- Single source boiler, burner and control
- Minimum excess air across the operating range
- Small footprint
- 3 pass model includes an option for an integral pre-piped feedwater economizer
Using advanced engineering methods, design engineers designed the CBEX to optimize every component of the boiler, including the burner, the furnace, and the tubes, in order to provide optimally balanced heat release zones and minimizing thermal stresses in the boiler. Extended heat transfer tubes only found in EX systems uses Computational Fluid Dynamics (CFD) calculations to optimize the geometry of the tube and increase heat transfer by 85%. The result of the advanced heat transfer design is higher efficiency in a smaller footprint. Offered in a two-pass, waterback or dryback design, the CBEX boiler package is engineered for long life, highest part load (or operational) fuel-to-steam/water efficiency, maximum safety and lowest emissions. Its quiet operation, ease of maintenance and flexibility to add desired options further enhances the package. Integration of the core components is the key to the CBEX systems. The superior Hawk control allows the boiler to run at the absolute maximum efficiency. Reduce fuel use with the optional stack economizer by recovering waste heat from flue gases and using it to preheat boiler feedwater. The LevelMaster low-water cutoff and pump control is the safest control available.
CBEX-3W: The Most Efficient Firetube Boiler in the Market →
VIEW BROCHURE →
WEBINARS
Steam Applications, Terminology and How to Achieve Best Results →
Learn how the industry defines steam from utility, saturated and superheated to filtered and clean.
Boiler Room Installation Considerations for Safety, Reliability, and Efficiency →
There are a number of factors that are important to consider when installing either a steam or hydronic boiler system in order to maximize safety, reliability and efficiency.
CBEX Boilers Selected for Clemens Food Group Plant Case Study →
Chinook Regional Hospital Installs CBEX Boilers Case Study →
- Process Steam
- Industrial Process
- Building Heat
- Sterilization
- Humidification
- Hospital and Healthcare
- Power and Utilities
- Refineries and Petrochemical
- Laundry and Dry Cleaning